Altaaqa is proud to have played a crucial role in transforming Jeddah’s Onyx Arena, which is poised to redefine event excellence in the Middle East. Tasked with providing both temporary power and a permanent HVAC system, Altaaqa has delivered an integrated solution encompassing 8.5 MW of power, 10 km of cabling, and a 2000-ton cooling system. This is Altaaqa’s largest HVAC project, earning acclaim from MiddleBeast and Production Glue.