EJAR Equipment Powers Tree Planting and Habitat Renewal in Al Soudah

The Alsoudah Development Project, led by the Alsoudah Development Company, is progressing under the main contractor AKAD – Abdulaziz Khalid Aldakeel Est. This five‑year initiative is currently in its second phase, focusing on planting 300,000 trees across various areas and preparing the environment for wildlife through cleaning works and the removal of old asphalt surfaces. EJAR is supporting this major environmental effort by supplying specialized equipment suited to the project’s terrain and operational needs. Two Mini Excavators (302CR) are operating in restricted areas between existing trees to ensure minimal disturbance. A Mini Excavator (306.5) equipped with a digging attachment is dedicated to tree‑planting activities, helping accelerate planting operations. Additionally, an SSL250 with a Cold Planer has been deployed to remove walking asphalt inside park zones, enabling proper soil preparation. EJAR is proud to contribute to this sustainable development initiative, supporting ecological restoration and long‑term environmental enhancement across Alsoudah.